Precision deployment at scale.
We manage the logistical complexity of national digital rollouts. From pre-deployment staging to on-site construction coordination, we ensure your network is delivered on time, on budget, and fully compliant.
Single-point accountability.
Deploying technology into a physical environment is a complex orchestration of trades, logistics, and IT requirements. When these elements are misaligned, projects suffer from delays, budget blowouts, and technical failures.
Entwined acts as the single point of accountability for your rollout. Whether retrofitting an existing fleet or integrating into a new "greenfield" construction build, our Project Management Office (PMO) coordinates all stakeholders, builders, electricians, and data cablers, to ensure the site is ready for a seamless installation.
Validated before shipment.
The most critical phase of our deployment process happens before the hardware leaves our warehouse. We do not ship "blind" boxes to site. Every media player and screen undergoes a rigorous Pre-Deployment Staging process in our local configuration centres.
Asset tagging.
Serial numbers are recorded and assigned to specific site locations in our management database.
Software loading.
Devices are flashed with the latest firmware and staged with your specific settings.
Burn-in testing.
Hardware is powered up and tested to identify and remove any "Dead on Arrival" (DOA) units, ensuring that only functional, ready-to-play equipment arrives at your location.
Operational capabilities.
Just-in-time delivery.
Construction sites are dusty, chaotic, and insecure environments, not ideal places to store expensive electronics. We manage the warehousing of your stock, coordinating freight to ensure hardware arrives on-site exactly when the installation team is ready to receive it. This "Just-in-Time" approach prevents damage and theft during the build phase.
National installation network.Consistency across borders.
We maintain a qualified network of technicians across Australia and New Zealand. This allows us to execute simultaneous rollouts across multiple states while maintaining a consistent standard of workmanship. Whether installing a single screen in a regional depot or a video wall in a CBD flagship, the cabling standards, mounting height, and finish quality remain uniform.
Construction coordination.Speaking the language of the build.
Our project managers differ from standard IT support; they understand construction. We work directly with your shopfitters and architects to validate structural blocking, power placement, and data cabling paths before the install. This proactive coordination prevents costly variations and re-works later in the project.
Complete project visibility.
A project is not finished until the paperwork is done. Upon completion, we provide a comprehensive "As-Built" handover pack. This includes photographic evidence of the installation, serial number registries, and network configuration details. This documentation is vital for your internal asset register and future maintenance workflows.